What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Stonehaven?
In Stonehaven, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£157,500. Prices in Scotland sit near the national average for this kind of work, and the range for Stonehaven reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£110,000 |
| Typical project (90 m²) | £76,500–£157,500 |
| Larger project (126 m²) | £107,000–£220,500 |
| Rate per m² | £850–£1,750 |
The main things that change the cost:
- Finishes
- Whether you live in during the work
- Structural and damp repairs
- Kitchens and bathrooms
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Stonehaven?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland internal alterations such as structural changes or new bathrooms may need a building warrant, and listed homes need listed building consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a house renovation:
- Decoration
- Plastering and boarding
- Kitchens and bathrooms
- Building control for notifiable work
- Structural repairs and damp treatment
- Condition survey and scope of works
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Stonehaven
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Our Stonehaven coverage includes postcode districts AB39, and we also work in nearby places such as Aberdeen, Westhill and Montrose.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Stonehaven
Do I need planning permission for a house renovation in Stonehaven?
In Scotland internal alterations such as structural changes or new bathrooms may need a building warrant, and listed homes need listed building consent.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
How much does a house renovation cost in Stonehaven?
In Stonehaven, a house renovation typically costs £850–£1,750 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£157,500. Your fixed price depends on the survey and drawings.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
Who approves a house renovation in Stonehaven?
Planning matters in Stonehaven go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.
