What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Stonehaven?
In Stonehaven, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £27,000–£38,500. Building costs in Scotland are close to the UK average, so the figures for Stonehaven are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £18,000–£25,500 |
| Typical project (12 m²) | £27,000–£38,500 |
| Larger project (17 m²) | £38,000–£54,500 |
| Rate per m² | £2,250–£3,200 |
Your quote will depend mainly on:
- Glazed roof specification
- Length of the side return
- Access through the house for materials
- Steel beams and propping of the back addition
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side return extension in Stonehaven?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical side return extension we handle:
- Written agreement with neighbours on shared walls
- Steel beams to remove the side wall
- Floor levelling, heating and electrics
- Foundations and drainage, including any build-over agreement
- Written agreement with neighbours on shared walls
- Building control sign-off
How long does it take?
Expect 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Stonehaven
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Projects in Stonehaven (AB39) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Stonehaven
How long does a side return extension take in Stonehaven?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How much does a side return extension cost in Stonehaven?
In Stonehaven, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £27,000–£38,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a side return extension in Stonehaven?
In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.