What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in West Yorkshire?
In West Yorkshire, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£148,500. Building costs in Yorkshire and the Humber run about 7% below the UK average, and the figures for West Yorkshire are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£104,000 |
| Typical project (90 m²) | £76,500–£148,500 |
| Larger project (126 m²) | £107,000–£208,000 |
| Rate per m² | £850–£1,650 |
Your quote will depend mainly on:
- Whether you live in during the work
- Structural and damp repairs
- Kitchens and bathrooms
- Windows and doors
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a house renovation in West Yorkshire?
The approval route for West Yorkshire is set by planning law in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Kitchens and bathrooms
- Structural repairs and damp treatment
- Condition survey and scope of works
- Building control for notifiable work
- Rewiring and heating upgrades
- Plastering and boarding
How long does it take?
Build time is typically 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in West Yorkshire
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
Towns we cover in West Yorkshire include Leeds, Bradford, Huddersfield, Wakefield, Halifax and Dewsbury.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about house renovations in West Yorkshire
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.
How much does a house renovation cost in West Yorkshire?
In West Yorkshire, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£148,500. Your fixed price depends on the survey and drawings.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Do you build house renovations in West Yorkshire?
Yes. We build house renovations across West Yorkshire, including postcodes BD1, BD10, BD11, BD12 and BD13. Every project starts with a free home visit.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
