What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Shipley?
In Shipley, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£148,500. We start from a UK-wide guide and adjust it for Yorkshire and the Humber, where labour and materials are typically about 7% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£104,000 |
| Typical project (90 m²) | £76,500–£148,500 |
| Larger project (126 m²) | £107,000–£208,000 |
| Rate per m² | £850–£1,650 |
What moves the price most:
- Extent of rewiring and replumbing
- Kitchens and bathrooms
- Structural and damp repairs
- Windows and doors
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a house renovation in Shipley?
Before anything is built in Shipley, we confirm which approvals apply in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most house renovations:
- Decoration
- Kitchens and bathrooms
- Structural repairs and damp treatment
- Rewiring and heating upgrades
- Joinery, doors and floors
- Plastering and boarding
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Shipley
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
If your home is in Shipley or close by in Bradford, Bingley and Guiseley, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in Shipley
How long does a full renovation take?
Typically 8 to 20 weeks on site depending on the size of the house and scope.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
Who approves a house renovation in Shipley?
Planning matters in Shipley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a house renovation cost in Shipley?
In Shipley, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£148,500. Your fixed price depends on the survey and drawings.
