What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Hackney?
In Hackney, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £64,000–£97,000. Building costs in London run about 30% above the UK average, and the figures for Hackney are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £43,500–£66,000 |
| Typical project (22 m²) | £64,000–£97,000 |
| Larger project (31 m²) | £90,000–£136,500 |
| Rate per m² | £2,900–£4,400 |
Your quote will depend mainly on:
- Kitchen units, worktops and appliances
- Extension size and roof design
- Underfloor heating and flooring
- Who supplies the kitchen
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a kitchen extension in Hackney?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Kitchen layout planned alongside the extension design
- Extension structure, roof and glazing
- Kitchen fitting, worktops and splashbacks
- Building control sign-off
- Drainage and water supply positioned for the sink and appliances
- Extraction ducted to outside
How long does it take?
Allow 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Hackney
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Our Hackney coverage includes postcode districts E2, E8 and E20, and we also work in nearby places such as Leyton, Bow and Stratford.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about kitchen extensions in Hackney
How much does a kitchen extension cost in Hackney?
In Hackney, a kitchen extension typically costs £2,900–£4,400 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £64,000–£97,000. Your fixed price depends on the survey and drawings.
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
Who approves a kitchen extension in Hackney?
Planning matters in Hackney go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
