What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Leominster?
In Leominster, a kitchen extension typically costs £2,200–£3,300 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £48,500–£72,500. Building costs in the West Midlands are close to the UK average, so the figures for Leominster are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £33,000–£49,500 |
| Typical project (22 m²) | £48,500–£72,500 |
| Larger project (31 m²) | £68,000–£102,500 |
| Rate per m² | £2,200–£3,300 |
Your quote will depend mainly on:
- Kitchen units, worktops and appliances
- Underfloor heating and flooring
- Island with sink or hob, which needs services in the floor
- Extension size and roof design
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a kitchen extension in Leominster?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most kitchen extensions:
- Extension structure, roof and glazing
- Kitchen layout planned alongside the extension design
- Electrics, lighting plan and sockets
- Building control sign-off
- Extraction ducted to outside
- Flooring and decoration
How long does it take?
Expect 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Leominster
The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.
If your home is in Leominster or close by in Hereford, Loughton and Ledbury, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about kitchen extensions in Leominster
How much does a kitchen extension cost in Leominster?
In Leominster, a kitchen extension typically costs £2,200–£3,300 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £48,500–£72,500. Your fixed price depends on the survey and drawings.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
Will I need planning permission?
The same rules apply as for any extension. Many single-storey kitchen extensions are permitted development; larger or wraparound designs need an application.
How long does a kitchen extension take in Leominster?
Typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals beforehand usually take 6 to 12 weeks.