SK Developments Free home visit0800 088 6248 Get a quote

HerefordshireSide extensions

Side extensions in Leominster

A side extension in Leominster starts with understanding the house: its age, its structure and its plot. We survey, design, apply for approvals and build, all under one contract.

Guide price in Leominster

£1,650–£2,550 per m² of floor area

In Leominster, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side extension?

Two-storey side extension in matching red brick on a semi-detached house with a block-paved drive

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.

How much does a side extension cost in Leominster?

In Leominster, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Building costs in the West Midlands are close to the UK average, so the figures for Leominster are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Leominster, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£33,000–£51,000
Typical project (28 m²)£46,000–£71,500
Larger project (39 m²)£64,500–£99,500
Rate per m²£1,650–£2,550

The biggest cost drivers are:

  • Single or two storeys
  • Drains, gas meters or soil pipes that need moving
  • Roof design and tile matching
  • Internal fit-out of the new rooms

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a side extension in Leominster?

The approval route for Leominster is set by planning law in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

Handled as part of most side extensions:

  • Structural calculations
  • Opening into the existing house
  • Electrics, heating and plastering
  • Planning drawings and application
  • Foundations and drainage alterations
  • Survey of the boundary, drains and access

How long does it take?

Allow 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Leominster

The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.

Projects in Leominster (HR6) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about side extensions in Leominster

How long does a side extension take in Leominster?

Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.

How close to the boundary can I build?

You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.

Will a two-storey side extension look odd?

Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.

How much does a side extension cost in Leominster?

In Leominster, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.

Will I lose my driveway?

A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.

Start with a guide price, then book a free survey for a fixed quote in Leominster.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price