What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Shipley?
In Shipley, a kitchen extension typically costs £2,100–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £46,000–£69,500. That range is adjusted for Yorkshire and the Humber, where domestic building work typically costs around 7% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £31,500–£47,000 |
| Typical project (22 m²) | £46,000–£69,500 |
| Larger project (31 m²) | £65,000–£97,500 |
| Rate per m² | £2,100–£3,150 |
The main things that change the cost:
- Island with sink or hob, which needs services in the floor
- Who supplies the kitchen
- Extension size and roof design
- Glazing and roof lanterns
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a kitchen extension in Shipley?
The approval route for Shipley is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical kitchen extension we handle:
- Electrics, lighting plan and sockets
- Building control sign-off
- Flooring and decoration
- Extraction ducted to outside
- Extension structure, roof and glazing
- Kitchen fitting, worktops and splashbacks
How long does it take?
Expect 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Shipley
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
From BD18 outwards, we take on projects throughout Shipley and the surrounding parts of West Yorkshire.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about kitchen extensions in Shipley
How much does a kitchen extension cost in Shipley?
In Shipley, a kitchen extension typically costs £2,100–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £46,000–£69,500. Your fixed price depends on the survey and drawings.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.
Who approves a kitchen extension in Shipley?
Planning matters in Shipley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do I need extraction to outside?
Building regulations require kitchen extract ventilation. Ducting to an outside wall is the most effective option and is planned during the build.