What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in Thornaby-on-Tees?
In Thornaby-on-Tees, a kitchen extension typically costs £2,100–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £46,000–£69,500. Prices across Yorkshire and the Humber are typically 7% below the UK average for this kind of work, which is reflected in the range for Thornaby-on-Tees. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £31,500–£47,000 |
| Typical project (22 m²) | £46,000–£69,500 |
| Larger project (31 m²) | £65,000–£97,500 |
| Rate per m² | £2,100–£3,150 |
Your quote will depend mainly on:
- Who supplies the kitchen
- Underfloor heating and flooring
- Kitchen units, worktops and appliances
- Glazing and roof lanterns
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a kitchen extension in Thornaby-on-Tees?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Flooring and decoration
- Kitchen layout planned alongside the extension design
- Extraction ducted to outside
- Building control sign-off
- Kitchen fitting, worktops and splashbacks
- Drainage and water supply positioned for the sink and appliances
How long does it take?
The build itself usually takes 11 to 16 weeks on site, including kitchen fitting. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Thornaby-on-Tees
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
We work across Thornaby-on-Tees and neighbouring areas such as Stockton-on-Tees, Yarm and Billingham. Postcodes we cover in Thornaby-on-Tees include TS17.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about kitchen extensions in Thornaby-on-Tees
Will I need planning permission?
The same rules apply as for any extension. Many single-storey kitchen extensions are permitted development; larger or wraparound designs need an application.
Do you build kitchen extensions in Thornaby-on-Tees?
Yes. We build kitchen extensions across Thornaby-on-Tees, including postcodes TS17. Every project starts with a free home visit.
How long will I be without a kitchen?
Usually 3 to 6 weeks at the end of the job, once the back wall is opened and the new kitchen goes in. We can help set up a temporary kitchen.
How much does a kitchen extension cost in Thornaby-on-Tees?
In Thornaby-on-Tees, a kitchen extension typically costs £2,100–£3,150 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £46,000–£69,500. Your fixed price depends on the survey and drawings.
Can I buy my own kitchen?
Yes. You can supply it and we fit it, or we supply it as part of the price. Either way we coordinate deliveries with the build programme.
