What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Arbroath?
In Arbroath, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Prices in Scotland sit near the national average for this kind of work, and the range for Arbroath reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £205,000–£325,500 |
| Typical project (150 m²) | £292,500–£465,000 |
| Larger project (210 m²) | £409,500–£651,000 |
| Rate per m² | £1,950–£3,100 |
The biggest cost drivers are:
- Specification and energy systems
- Services connections
- Ground conditions and foundations
- External works and landscaping
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Arbroath?
Approvals for a new build home in Arbroath follow the rules for Scotland. In Scotland a new home needs planning permission and a building warrant before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Design and planning application
- Superstructure, roof and windows
- Building control completion and warranty liaison
- Mechanical and electrical installation
- Site appraisal and feasibility
- Groundworks, foundations and drainage
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Arbroath
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Projects in Arbroath (DD11) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Arbroath
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
How much does a new build home cost in Arbroath?
In Arbroath, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
Do you build new build homes in Arbroath?
Yes. We build new build homes across Arbroath, including postcodes DD11. Every project starts with a free home visit.
Do I need planning permission for a new build home in Arbroath?
In Scotland a new home needs planning permission and a building warrant before work starts.