What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Billericay?
In Billericay, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Billericay. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £220,500–£357,000 |
| Typical project (150 m²) | £315,000–£510,000 |
| Larger project (210 m²) | £441,000–£714,000 |
| Rate per m² | £2,100–£3,400 |
What moves the price most:
- Ground conditions and foundations
- Site access and demolition
- Specification and energy systems
- Services connections
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Billericay?
Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a new build home:
- Site appraisal and feasibility
- Superstructure, roof and windows
- Building control completion and warranty liaison
- Groundworks, foundations and drainage
- Mechanical and electrical installation
- Internal fit-out and finishes
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Billericay
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
From CM11 outwards, we take on projects throughout Billericay and the surrounding parts of Essex.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Billericay
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How much does a new build home cost in Billericay?
In Billericay, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £315,000–£510,000. Your fixed price depends on the survey and drawings.
How long does a new build home take in Billericay?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
