SK Developments Free home visit0800 088 6248 Get a quote

EssexNew build homes

New build homes in Brentwood

A new build home in Brentwood starts with the site: access, services, ground conditions and planning. We work through each before giving a fixed price.

Guide price in Brentwood

£2,100–£3,400 per m² of floor area (build cost)

In Brentwood, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Brentwood?

In Brentwood, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.

Guide prices for Brentwood, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£220,500–£357,000
Typical project (150 m²)£315,000–£510,000
Larger project (210 m²)£441,000–£714,000
Rate per m²£2,100–£3,400

The biggest cost drivers are:

  • External works and landscaping
  • Size and complexity of the house
  • Ground conditions and foundations
  • Services connections

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a new build home in Brentwood?

Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

The work we manage on a new build home:

  • Building control completion and warranty liaison
  • Superstructure, roof and windows
  • Internal fit-out and finishes
  • Design and planning application
  • Structural and services design
  • Site appraisal and feasibility

How long does it take?

Expect 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.

Building in Brentwood

Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.

Our Brentwood coverage includes postcode districts CM14, and we also work in nearby places such as Billericay, Upminster and Hornchurch.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about new build homes in Brentwood

How long does a new build home take in Brentwood?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

How much does a new build home cost in Brentwood?

In Brentwood, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £315,000–£510,000. Your fixed price depends on the survey and drawings.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Start with a guide price, then book a free survey for a fixed quote in Brentwood.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price