SK Developments Free home visit0800 088 6248 Get a quote

LincolnshireNew build homes

New build homes in Boston

We take on new build homes in Boston, about 27 miles south-east of Lincoln, starting with a free look at the site and a clear view of the approvals needed.

Guide price in Boston

£1,900–£3,050 per m² of floor area (build cost)

In Boston, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£457,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Boston?

In Boston, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£457,500. We start from a UK-wide guide and adjust it for the East Midlands, where labour and materials are typically about 5% below average. Design, structural calculations and council fees are extra.

Guide prices for Boston, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£199,500–£320,000
Typical project (150 m²)£285,000–£457,500
Larger project (210 m²)£399,000–£640,500
Rate per m²£1,900–£3,050

Your quote will depend mainly on:

  • External works and landscaping
  • Specification and energy systems
  • Services connections
  • Ground conditions and foundations

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Boston?

Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

From survey to sign-off, the job normally involves:

  • Internal fit-out and finishes
  • Groundworks, foundations and drainage
  • Superstructure, roof and windows
  • Structural and services design
  • Building control completion and warranty liaison
  • Mechanical and electrical installation

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Boston

In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.

Boston sits in Lincolnshire, about 27 miles south-east of Lincoln. We cover the whole of Boston, including postcodes PE21.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Boston

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

How much does a new build home cost in Boston?

In Boston, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£457,500. Your fixed price depends on the survey and drawings.

Who approves a new build home in Boston?

Planning matters in Boston go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Ready to talk about a new build home in Boston? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price