What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Boston?
In Boston, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). The guide for Boston reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,500–£4,250 |
| Larger or more complex projects | £4,250–£5,250 |
The biggest cost drivers are:
- Planning or building regulations stage
- 3D visuals
- Structural engineer’s fees
- Measured survey complexity
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Boston
Before anything is built in Boston, we confirm which approvals apply in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most architectural drawings:
- Party wall drawings where needed
- Measured survey of the existing house
- 3D views on request
- Planning drawings: plans, elevations, site and location plans
- Tender-ready drawing pack
- Structural calculations coordinated
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Boston
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
From PE21 outwards, we take on projects throughout Boston and the surrounding parts of Lincolnshire.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about architectural drawings in Boston
What are building regulations drawings?
More detailed drawings and specifications showing structure, insulation, fire safety, drainage and ventilation, used for building control approval and pricing.
Do you prepare architectural drawings in Boston?
Yes. We prepare architectural drawings across Boston, including postcodes PE21. Every project starts with a free home visit.
What drawings are needed for planning?
Usually existing and proposed floor plans and elevations, a block plan and a location plan. Some councils need more.
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.
How much does a set of architectural drawings cost in Boston?