What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Brecon?
In Brecon, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £277,500–£442,500. Building costs in Wales run about 8% below the UK average, and the figures for Brecon are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£310,000 |
| Typical project (150 m²) | £277,500–£442,500 |
| Larger project (210 m²) | £388,500–£619,500 |
| Rate per m² | £1,850–£2,950 |
The biggest cost drivers are:
- External works and landscaping
- Site access and demolition
- Size and complexity of the house
- Ground conditions and foundations
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Brecon?
Whether you need planning permission depends on your house and its location in Wales. In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a new build home:
- Design and planning application
- Building control completion and warranty liaison
- Mechanical and electrical installation
- Structural and services design
- Superstructure, roof and windows
- Internal fit-out and finishes
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Brecon
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Projects in Brecon (LD3) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Brecon
Do I need planning permission for a new build home in Brecon?
In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
How much does a new build home cost in Brecon?
In Brecon, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £277,500–£442,500. Your fixed price depends on the survey and drawings.
Do you build new build homes in Brecon?
Yes. We build new build homes across Brecon, including postcodes LD3. Every project starts with a free home visit.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
