What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Powys?
In Powys, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £277,500–£442,500. The guide for Powys reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£310,000 |
| Typical project (150 m²) | £277,500–£442,500 |
| Larger project (210 m²) | £388,500–£619,500 |
| Rate per m² | £1,850–£2,950 |
The biggest cost drivers are:
- External works and landscaping
- Size and complexity of the house
- Ground conditions and foundations
- Site access and demolition
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a new build home in Powys?
Here is how the rules work for a new build home in Wales. In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a new build home:
- Internal fit-out and finishes
- Superstructure, roof and windows
- Groundworks, foundations and drainage
- Site appraisal and feasibility
- Design and planning application
- Building control completion and warranty liaison
How long does it take?
Allow 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Powys
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Towns we cover in Powys include Newtown, Brecon, Welshpool and Llandrindod Wells.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Powys
Do I need planning permission for a new build home in Powys?
In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How much does a new build home cost in Powys?
In Powys, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £277,500–£442,500. Your fixed price depends on the survey and drawings.
Do you build new build homes in Powys?
Yes. We build new build homes across Powys, including postcodes CF44, CF48, HR3, HR5 and LD1. Every project starts with a free home visit.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
