What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Bridgend?
In Bridgend, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £277,500–£442,500. The guide for Bridgend reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£310,000 |
| Typical project (150 m²) | £277,500–£442,500 |
| Larger project (210 m²) | £388,500–£619,500 |
| Rate per m² | £1,850–£2,950 |
What moves the price most:
- Size and complexity of the house
- Services connections
- Site access and demolition
- Specification and energy systems
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Bridgend?
The approval route for Bridgend is set by planning law in Wales. In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Structural and services design
- Internal fit-out and finishes
- Mechanical and electrical installation
- Superstructure, roof and windows
- Building control completion and warranty liaison
- Design and planning application
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Bridgend
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
From CF31 outwards, we take on projects throughout Bridgend and the surrounding parts of Mid Glamorgan.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Bridgend
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Who approves a new build home in Bridgend?
Planning matters in Bridgend go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How much does a new build home cost in Bridgend?
In Bridgend, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £277,500–£442,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a new build home in Bridgend?
In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.