What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Burgess Hill?
In Burgess Hill, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Burgess Hill. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £236,000–£378,000 |
| Typical project (150 m²) | £337,500–£540,000 |
| Larger project (210 m²) | £472,500–£756,000 |
| Rate per m² | £2,250–£3,600 |
Your quote will depend mainly on:
- Services connections
- External works and landscaping
- Size and complexity of the house
- Ground conditions and foundations
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a new build home in Burgess Hill?
Before anything is built in Burgess Hill, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Internal fit-out and finishes
- Superstructure, roof and windows
- Mechanical and electrical installation
- Structural and services design
- Site appraisal and feasibility
- Groundworks, foundations and drainage
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Burgess Hill
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Burgess Hill sits in West Sussex, about 9 miles north of Brighton. We cover the whole of Burgess Hill, including postcodes RH15.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Burgess Hill
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).
How much does a new build home cost in Burgess Hill?
In Burgess Hill, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.
How long does a new build home take in Burgess Hill?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.