SK Developments Free home visit0800 088 6248 Get a quote

West SussexNew build homes

New build homes in Shoreham-by-Sea

Planning a new build home in Shoreham-by-Sea? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in Shoreham-by-Sea

£2,250–£3,600 per m² of floor area (build cost)

In Shoreham-by-Sea, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Shoreham-by-Sea?

In Shoreham-by-Sea, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Shoreham-by-Sea. Design, structural calculations and council fees are extra.

Guide prices for Shoreham-by-Sea, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£236,000–£378,000
Typical project (150 m²)£337,500–£540,000
Larger project (210 m²)£472,500–£756,000
Rate per m²£2,250–£3,600

The biggest cost drivers are:

  • Specification and energy systems
  • Size and complexity of the house
  • Ground conditions and foundations
  • External works and landscaping

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in Shoreham-by-Sea?

Approvals for a new build home in Shoreham-by-Sea follow the rules for England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

From survey to sign-off, the job normally involves:

  • Superstructure, roof and windows
  • Groundworks, foundations and drainage
  • Building control completion and warranty liaison
  • Structural and services design
  • Internal fit-out and finishes
  • Design and planning application

How long does it take?

Expect 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.

Building in Shoreham-by-Sea

The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.

From BN43 outwards, we take on projects throughout Shoreham-by-Sea and the surrounding parts of West Sussex.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Shoreham-by-Sea

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

How much does a new build home cost in Shoreham-by-Sea?

In Shoreham-by-Sea, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.

Do you build new build homes in Shoreham-by-Sea?

Yes. We build new build homes across Shoreham-by-Sea, including postcodes BN43. Every project starts with a free home visit.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Tell us about your project in Shoreham-by-Sea and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price