What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Bushey?
In Bushey, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Bushey. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £220,500–£357,000 |
| Typical project (150 m²) | £315,000–£510,000 |
| Larger project (210 m²) | £441,000–£714,000 |
| Rate per m² | £2,100–£3,400 |
The biggest cost drivers are:
- Site access and demolition
- Size and complexity of the house
- Specification and energy systems
- Services connections
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Bushey?
The approval route for Bushey is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical new build home we handle:
- Design and planning application
- Structural and services design
- Internal fit-out and finishes
- Groundworks, foundations and drainage
- Building control completion and warranty liaison
- Mechanical and electrical installation
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Bushey
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Bushey sits in Hertfordshire, about 16 miles south-west of Hertford. We cover the whole of Bushey, including postcodes WD1 and WD23.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Bushey
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How much does a new build home cost in Bushey?
In Bushey, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £315,000–£510,000. Your fixed price depends on the survey and drawings.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How long does a new build home take in Bushey?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.