SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonNew build homes

New build homes in Edgware

Planning a new build home in Edgware? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in Edgware

£2,600–£4,150 per m² of floor area (build cost)

In Edgware, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Edgware?

In Edgware, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. Building costs in London run about 30% above the UK average, and the figures for Edgware are adjusted to reflect that. Design, structural calculations and council fees are extra.

Guide prices for Edgware, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£273,000–£436,000
Typical project (150 m²)£390,000–£622,500
Larger project (210 m²)£546,000–£871,500
Rate per m²£2,600–£4,150

What moves the price most:

  • Size and complexity of the house
  • Specification and energy systems
  • External works and landscaping
  • Site access and demolition

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a new build home in Edgware?

Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

Handled as part of most new build homes:

  • Mechanical and electrical installation
  • Design and planning application
  • Structural and services design
  • Internal fit-out and finishes
  • Groundworks, foundations and drainage
  • Site appraisal and feasibility

How long does it take?

The build itself usually takes 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Edgware

Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.

Edgware sits in Greater London, about 10 miles north-west of central London. We cover the whole of Edgware, including postcodes HA8.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Edgware

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Who approves a new build home in Edgware?

Planning matters in Edgware go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How much does a new build home cost in Edgware?

In Edgware, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Start with a guide price, then book a free survey for a fixed quote in Edgware.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price