What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Caldicot?
In Caldicot, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £277,500–£442,500. Building costs in Wales run about 8% below the UK average, and the figures for Caldicot are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£310,000 |
| Typical project (150 m²) | £277,500–£442,500 |
| Larger project (210 m²) | £388,500–£619,500 |
| Rate per m² | £1,850–£2,950 |
What moves the price most:
- Services connections
- Size and complexity of the house
- Site access and demolition
- Ground conditions and foundations
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Caldicot?
Before anything is built in Caldicot, we confirm which approvals apply in Wales. In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical new build home we handle:
- Structural and services design
- Superstructure, roof and windows
- Building control completion and warranty liaison
- Mechanical and electrical installation
- Site appraisal and feasibility
- Internal fit-out and finishes
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Caldicot
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
We work across Caldicot and neighbouring areas such as Chepstow, Newport and Cwmbran. Postcodes we cover in Caldicot include NP26.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Caldicot
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Do I need planning permission for a new build home in Caldicot?
In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
How much does a new build home cost in Caldicot?
In Caldicot, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £277,500–£442,500. Your fixed price depends on the survey and drawings.
Who approves a new build home in Caldicot?
Planning matters in Caldicot go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.