SK Developments Free home visit0800 088 6248 Get a quote

EnglandNew build homes

New build homes in Cornwall

Our new build home service covers Cornwall, including Redruth, Falmouth and St Austell. You deal with one company from the first visit to the completion certificate.

Guide price in Cornwall

£2,050–£3,250 per m² of floor area (build cost)

In Cornwall, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Cornwall?

In Cornwall, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500. Prices in the South West sit near the national average for this kind of work, and the range for Cornwall reflects that. Design, structural calculations and council fees are extra.

Guide prices for Cornwall, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£215,000–£341,000
Typical project (150 m²)£307,500–£487,500
Larger project (210 m²)£430,500–£682,500
Rate per m²£2,050–£3,250

What moves the price most:

  • Services connections
  • Size and complexity of the house
  • External works and landscaping
  • Site access and demolition

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Cornwall?

Before anything is built in Cornwall, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

From survey to sign-off, the job normally involves:

  • Groundworks, foundations and drainage
  • Site appraisal and feasibility
  • Mechanical and electrical installation
  • Building control completion and warranty liaison
  • Superstructure, roof and windows
  • Structural and services design

How long does it take?

Expect 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Cornwall

In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.

Towns we cover in Cornwall include Redruth, Falmouth, St Austell, Truro, Camborne and Newquay.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Cornwall

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

How long does a new build home take in Cornwall?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

How much does a new build home cost in Cornwall?

In Cornwall, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £307,500–£487,500. Your fixed price depends on the survey and drawings.

Ready to talk about a new build home in Cornwall? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price