SK Developments Free home visit0800 088 6248 Get a quote

CornwallNew build homes

New build homes in Falmouth

Planning a new build home in Falmouth? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in Falmouth

£2,050–£3,250 per m² of floor area (build cost)

In Falmouth, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Falmouth?

In Falmouth, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500. Prices in the South West sit near the national average for this kind of work, and the range for Falmouth reflects that. Design, structural calculations and council fees are extra.

Guide prices for Falmouth, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£215,000–£341,000
Typical project (150 m²)£307,500–£487,500
Larger project (210 m²)£430,500–£682,500
Rate per m²£2,050–£3,250

The biggest cost drivers are:

  • Site access and demolition
  • Ground conditions and foundations
  • Size and complexity of the house
  • Specification and energy systems

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in Falmouth?

Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

The work we manage on a new build home:

  • Design and planning application
  • Mechanical and electrical installation
  • Structural and services design
  • Superstructure, roof and windows
  • Internal fit-out and finishes
  • Site appraisal and feasibility

How long does it take?

Allow 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.

Building in Falmouth

The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.

We work across Falmouth and neighbouring areas such as Truro, Redruth and Camborne. Postcodes we cover in Falmouth include TR11.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about new build homes in Falmouth

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

How much does a new build home cost in Falmouth?

In Falmouth, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £307,500–£487,500. Your fixed price depends on the survey and drawings.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

How long does a new build home take in Falmouth?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Ready to talk about a new build home in Falmouth? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price