What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Crawley?
In Crawley, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Crawley. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £236,000–£378,000 |
| Typical project (150 m²) | £337,500–£540,000 |
| Larger project (210 m²) | £472,500–£756,000 |
| Rate per m² | £2,250–£3,600 |
The biggest cost drivers are:
- External works and landscaping
- Specification and energy systems
- Services connections
- Site access and demolition
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Crawley?
Before anything is built in Crawley, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a new build home:
- Site appraisal and feasibility
- Structural and services design
- Superstructure, roof and windows
- Internal fit-out and finishes
- Design and planning application
- Building control completion and warranty liaison
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Crawley
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Crawley sits in West Sussex, about 20 miles north of Brighton. We cover the whole of Crawley, including postcodes RH11 and RH77.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Crawley
How much does a new build home cost in Crawley?
In Crawley, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How long does a new build home take in Crawley?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
