SK Developments Free home visit0800 088 6248 Get a quote

EnglandNew build homes

New build homes in Devon

We take on new build homes throughout Devon, including Plymouth, Exeter and Paignton, with a free home visit and a fixed quote for the agreed specification.

Guide price in Devon

£2,050–£3,250 per m² of floor area (build cost)

In Devon, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Devon?

In Devon, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500. Prices in the South West sit near the national average for this kind of work, and the range for Devon reflects that. Design, structural calculations and council fees are extra.

Guide prices for Devon, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£215,000–£341,000
Typical project (150 m²)£307,500–£487,500
Larger project (210 m²)£430,500–£682,500
Rate per m²£2,050–£3,250

The main things that change the cost:

  • Services connections
  • Ground conditions and foundations
  • External works and landscaping
  • Size and complexity of the house

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a new build home in Devon?

Approvals for a new build home in Devon follow the rules for England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • Groundworks, foundations and drainage
  • Design and planning application
  • Building control completion and warranty liaison
  • Superstructure, roof and windows
  • Mechanical and electrical installation
  • Structural and services design

How long does it take?

The build itself usually takes 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Devon

The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.

Towns we cover in Devon include Plymouth, Exeter, Paignton, Torquay, Newton Abbot and Exmouth.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Devon

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

How much does a new build home cost in Devon?

In Devon, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £307,500–£487,500. Your fixed price depends on the survey and drawings.

How long does a new build home take in Devon?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Get a free, no-obligation home visit for your new build home in Devon.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price