What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Exeter?
In Exeter, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500. Prices in the South West sit near the national average for this kind of work, and the range for Exeter reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £215,000–£341,000 |
| Typical project (150 m²) | £307,500–£487,500 |
| Larger project (210 m²) | £430,500–£682,500 |
| Rate per m² | £2,050–£3,250 |
The main things that change the cost:
- External works and landscaping
- Services connections
- Size and complexity of the house
- Specification and energy systems
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Exeter?
Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Groundworks, foundations and drainage
- Structural and services design
- Superstructure, roof and windows
- Internal fit-out and finishes
- Site appraisal and feasibility
- Building control completion and warranty liaison
How long does it take?
Allow 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Exeter
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
If your home is in Exeter or close by in Heavitree, Exmouth and Tiverton, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Exeter
How much does a new build home cost in Exeter?
In Exeter, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £307,500–£487,500. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).
How long does a new build home take in Exeter?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.