What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Earl Shilton?
In Earl Shilton, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£457,500. Prices across the East Midlands are typically 5% below the UK average for this kind of work, which is reflected in the range for Earl Shilton. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £199,500–£320,000 |
| Typical project (150 m²) | £285,000–£457,500 |
| Larger project (210 m²) | £399,000–£640,500 |
| Rate per m² | £1,900–£3,050 |
The main things that change the cost:
- External works and landscaping
- Specification and energy systems
- Ground conditions and foundations
- Services connections
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Earl Shilton?
Before anything is built in Earl Shilton, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Internal fit-out and finishes
- Groundworks, foundations and drainage
- Structural and services design
- Mechanical and electrical installation
- Superstructure, roof and windows
- Design and planning application
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Earl Shilton
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
We work across Earl Shilton and neighbouring areas such as Hinckley, Nuneaton and Leicester. Postcodes we cover in Earl Shilton include LE9.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Earl Shilton
How much does a new build home cost in Earl Shilton?
In Earl Shilton, a new build home typically costs £1,900–£3,050 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£457,500. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How long does a new build home take in Earl Shilton?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.