What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Forest Hill?
In Forest Hill, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £273,000–£436,000 |
| Typical project (150 m²) | £390,000–£622,500 |
| Larger project (210 m²) | £546,000–£871,500 |
| Rate per m² | £2,600–£4,150 |
The biggest cost drivers are:
- Ground conditions and foundations
- Size and complexity of the house
- Site access and demolition
- External works and landscaping
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Forest Hill?
Before anything is built in Forest Hill, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Building control completion and warranty liaison
- Site appraisal and feasibility
- Structural and services design
- Groundworks, foundations and drainage
- Internal fit-out and finishes
- Mechanical and electrical installation
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Forest Hill
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
Projects in Forest Hill (SE23) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Forest Hill
How long does a new build home take in Forest Hill?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
How much does a new build home cost in Forest Hill?
In Forest Hill, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).