SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonNew build homes

New build homes in Greenford

Planning a new build home in Greenford? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in Greenford

£2,600–£4,150 per m² of floor area (build cost)

In Greenford, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Greenford?

In Greenford, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Greenford. Design, structural calculations and council fees are extra.

Guide prices for Greenford, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£273,000–£436,000
Typical project (150 m²)£390,000–£622,500
Larger project (210 m²)£546,000–£871,500
Rate per m²£2,600–£4,150

The biggest cost drivers are:

  • Ground conditions and foundations
  • Specification and energy systems
  • Size and complexity of the house
  • Site access and demolition

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Greenford?

The approval route for Greenford is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

The work we manage on a new build home:

  • Internal fit-out and finishes
  • Structural and services design
  • Building control completion and warranty liaison
  • Site appraisal and feasibility
  • Mechanical and electrical installation
  • Superstructure, roof and windows

How long does it take?

Expect 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Greenford

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

If your home is in Greenford or close by in Northolt, Southall and Ealing, a free home visit is the first step.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Greenford

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

How much does a new build home cost in Greenford?

In Greenford, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.

How long does a new build home take in Greenford?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

Ready to talk about a new build home in Greenford? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price