SK Developments Free home visit0800 088 6248 Get a quote

KentNew build homes

New build homes in Herne Bay

We take on new build homes in Herne Bay, about 21 miles south-east of Southend-on-Sea, starting with a free look at the site and a clear view of the approvals needed.

Guide price in Herne Bay

£2,250–£3,600 per m² of floor area (build cost)

In Herne Bay, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Herne Bay?

In Herne Bay, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. The guide for Herne Bay reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Herne Bay, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£236,000–£378,000
Typical project (150 m²)£337,500–£540,000
Larger project (210 m²)£472,500–£756,000
Rate per m²£2,250–£3,600

The main things that change the cost:

  • Site access and demolition
  • Ground conditions and foundations
  • External works and landscaping
  • Size and complexity of the house

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Herne Bay?

Approvals for a new build home in Herne Bay follow the rules for England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

From survey to sign-off, the job normally involves:

  • Mechanical and electrical installation
  • Superstructure, roof and windows
  • Groundworks, foundations and drainage
  • Design and planning application
  • Site appraisal and feasibility
  • Internal fit-out and finishes

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Herne Bay

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

If your home is in Herne Bay or close by in Whitstable, Canterbury and Faversham, a free home visit is the first step.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Herne Bay

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

How long does a new build home take in Herne Bay?

Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.

How much does a new build home cost in Herne Bay?

In Herne Bay, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in Herne Bay.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price