What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Inverurie?
In Inverurie, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Prices in Scotland sit near the national average for this kind of work, and the range for Inverurie reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £205,000–£325,500 |
| Typical project (150 m²) | £292,500–£465,000 |
| Larger project (210 m²) | £409,500–£651,000 |
| Rate per m² | £1,950–£3,100 |
Your quote will depend mainly on:
- Site access and demolition
- Ground conditions and foundations
- Specification and energy systems
- External works and landscaping
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Inverurie?
Here is how the rules work for a new build home in Scotland. In Scotland a new home needs planning permission and a building warrant before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most new build homes:
- Groundworks, foundations and drainage
- Building control completion and warranty liaison
- Site appraisal and feasibility
- Design and planning application
- Superstructure, roof and windows
- Internal fit-out and finishes
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Inverurie
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
If your home is in Inverurie or close by in Westhill, Aberdeen and Stonehaven, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Inverurie
How much does a new build home cost in Inverurie?
In Inverurie, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Do I need planning permission for a new build home in Inverurie?
In Scotland a new home needs planning permission and a building warrant before work starts.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Who approves a new build home in Inverurie?
Planning matters in Inverurie go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
