What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Inverurie?
In Inverurie, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Prices in Scotland sit near the national average for this kind of work, and the range for Inverurie reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
The biggest cost drivers are:
- Site access and phasing
- Roads, sewers and adoption agreements
- Specification
- Number and size of homes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Inverurie?
Here is how the rules work for a small housing development in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a small housing development:
- Groundworks, roads and drainage
- Design development and discharge of conditions
- Pre-construction cost plan
- External works and landscaping
- Handover packs for each home
- Utility connections
How long does it take?
Expect 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Inverurie
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
If your home is in Inverurie or close by in Westhill, Aberdeen and Stonehaven, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Inverurie
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How long does a small housing development take in Inverurie?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.
Do I need planning permission for a small housing development in Inverurie?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Inverurie?
In Inverurie, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.