What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Kempston?
In Kempston, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000. Building costs in the East of England run about 6% above the UK average, and the figures for Kempston are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £220,500–£357,000 |
| Typical project (150 m²) | £315,000–£510,000 |
| Larger project (210 m²) | £441,000–£714,000 |
| Rate per m² | £2,100–£3,400 |
What moves the price most:
- Ground conditions and foundations
- External works and landscaping
- Site access and demolition
- Size and complexity of the house
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Kempston?
Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a new build home:
- Building control completion and warranty liaison
- Mechanical and electrical installation
- Internal fit-out and finishes
- Superstructure, roof and windows
- Site appraisal and feasibility
- Groundworks, foundations and drainage
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Kempston
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Kempston sits in Bedfordshire, about 2 miles south-west of Bedford. We cover the whole of Kempston, including postcodes MK42.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Kempston
How much does a new build home cost in Kempston?
In Kempston, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £315,000–£510,000. Your fixed price depends on the survey and drawings.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
Do you build new build homes in Kempston?
Yes. We build new build homes across Kempston, including postcodes MK42. Every project starts with a free home visit.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.