What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Leigh?
In Leigh, a new build home typically costs £1,900–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£450,000. The guide for Leigh reflects typical costs in the North West, roughly 6% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £199,500–£315,000 |
| Typical project (150 m²) | £285,000–£450,000 |
| Larger project (210 m²) | £399,000–£630,000 |
| Rate per m² | £1,900–£3,000 |
The biggest cost drivers are:
- Ground conditions and foundations
- Services connections
- Site access and demolition
- External works and landscaping
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Leigh?
Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Internal fit-out and finishes
- Site appraisal and feasibility
- Structural and services design
- Superstructure, roof and windows
- Groundworks, foundations and drainage
- Building control completion and warranty liaison
How long does it take?
Expect 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Leigh
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
If your home is in Leigh or close by in Atherton, Tyldesley and Golborne, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Leigh
Who approves a new build home in Leigh?
Planning matters in Leigh go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
How much does a new build home cost in Leigh?
In Leigh, a new build home typically costs £1,900–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£450,000. Your fixed price depends on the survey and drawings.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.