SK Developments Free home visit0800 088 6248 Get a quote

Greater ManchesterPlanning and building regulations

Planning and building regulations in Leigh

From the first sketch to approval, we look after planning and building regulations applications for projects in Leigh and the surrounding parts of Greater Manchester.

Guide price in Leigh

£750–£2,250 for application management (council fees extra)

In Leigh, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a planning or building regulations application?

Surveyor measuring the rear of a brick semi-detached house with a laser measure

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.

How much does a planning or building regulations application cost in Leigh?

In Leigh, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). The guide for Leigh reflects typical costs in the North West, roughly 6% below the UK-wide figure. Council application fees are extra.

Guide prices for Leigh, including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT)
Size or typeGuide range
Application management (council fees extra)£750–£2,250
Larger or more complex projects£2,250–£2,750

The biggest cost drivers are:

  • Building control route
  • Planning conditions
  • Council fees
  • Type of application

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Planning and building regulations in Leigh

Before anything is built in Leigh, we confirm which approvals apply in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

Handled as part of most planning and building regulations applications:

  • Lawful development certificate applications
  • Party wall notices
  • Discharge of planning conditions
  • Permitted development assessment
  • Build-over agreements with the water company
  • Prior approval (larger home extension) in England

How long does it take?

Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Leigh

Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.

From WN7 outwards, we take on projects throughout Leigh and the surrounding parts of Greater Manchester.

How it works

  1. 01

    Survey and brief

    We visit, talk through what you want and record the existing building.

  2. 02

    Design options

    Sketch layouts to agree the approach before detailed drawing starts.

  3. 03

    Application drawings

    Plans, elevations and supporting documents prepared for the council.

  4. 04

    Submission and follow-up

    We submit the application and deal with questions from the council or building control.

Questions about planning and building regulations applications in Leigh

Do I need a party wall agreement?

In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.

Who carries out building control?

Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.

How much does a planning or building regulations application cost in Leigh?

In Leigh, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.

What is a lawful development certificate?

A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.

Do you handle planning and building regulations applications in Leigh?

Yes. We handle planning and building regulations applications across Leigh, including postcodes WN7. Every project starts with a free home visit.

Start with a guide price, then book a free survey for a fixed quote in Leigh.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price