What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Omagh?
In Omagh, a new build home typically costs £1,700–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £255,000–£412,500. Building costs in Northern Ireland run about 14% below the UK average, and the figures for Omagh are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £178,500–£289,000 |
| Typical project (150 m²) | £255,000–£412,500 |
| Larger project (210 m²) | £357,000–£577,500 |
| Rate per m² | £1,700–£2,750 |
The main things that change the cost:
- Specification and energy systems
- Ground conditions and foundations
- Site access and demolition
- External works and landscaping
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Omagh?
Approvals for a new build home in Omagh follow the rules for Northern Ireland. In Northern Ireland a new home needs planning permission from the council and building control approval.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a new build home:
- Site appraisal and feasibility
- Structural and services design
- Groundworks, foundations and drainage
- Superstructure, roof and windows
- Building control completion and warranty liaison
- Internal fit-out and finishes
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Omagh
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT78 outwards, we take on projects throughout Omagh and the surrounding parts of County Tyrone.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Omagh
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
How much does a new build home cost in Omagh?
In Omagh, a new build home typically costs £1,700–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £255,000–£412,500. Your fixed price depends on the survey and drawings.
Do you build new build homes in Omagh?
Yes. We build new build homes across Omagh, including postcodes BT78 and BT79. Every project starts with a free home visit.
Do I need planning permission for a new build home in Omagh?
In Northern Ireland a new home needs planning permission from the council and building control approval.
