SK Developments Free home visit0800 088 6248 Get a quote

Scottish BordersNew build homes

New build homes in Selkirk

SK Developments builds new build homes in Selkirk and across the Scottish Borders, working with plot owners and developers from feasibility to completion.

Guide price in Selkirk

£1,950–£3,100 per m² of floor area (build cost)

In Selkirk, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Selkirk?

In Selkirk, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Building costs in Scotland are close to the UK average, so the figures for Selkirk are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Selkirk, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£205,000–£325,500
Typical project (150 m²)£292,500–£465,000
Larger project (210 m²)£409,500–£651,000
Rate per m²£1,950–£3,100

What moves the price most:

  • Ground conditions and foundations
  • Specification and energy systems
  • Size and complexity of the house
  • Services connections

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a new build home in Selkirk?

Approvals for a new build home in Selkirk follow the rules for Scotland. In Scotland a new home needs planning permission and a building warrant before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

On a typical new build home we handle:

  • Design and planning application
  • Building control completion and warranty liaison
  • Internal fit-out and finishes
  • Superstructure, roof and windows
  • Mechanical and electrical installation
  • Structural and services design

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Selkirk

In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.

We work across Selkirk and neighbouring areas such as Galashiels, Hawick and Peebles. Postcodes we cover in Selkirk include TD7.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about new build homes in Selkirk

Do I need planning permission for a new build home in Selkirk?

In Scotland a new home needs planning permission and a building warrant before work starts.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Do you build new build homes in Selkirk?

Yes. We build new build homes across Selkirk, including postcodes TD7. Every project starts with a free home visit.

How much does a new build home cost in Selkirk?

In Selkirk, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Get a free, no-obligation home visit for your new build home in Selkirk.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price