What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Stretford?
In Stretford, a new build home typically costs £1,900–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £285,000–£450,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Stretford. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £199,500–£315,000 |
| Typical project (150 m²) | £285,000–£450,000 |
| Larger project (210 m²) | £399,000–£630,000 |
| Rate per m² | £1,900–£3,000 |
The biggest cost drivers are:
- Size and complexity of the house
- Ground conditions and foundations
- Specification and energy systems
- External works and landscaping
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Stretford?
The approval route for Stretford is set by planning law in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Site appraisal and feasibility
- Structural and services design
- Building control completion and warranty liaison
- Mechanical and electrical installation
- Groundworks, foundations and drainage
- Internal fit-out and finishes
How long does it take?
Allow 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Stretford
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Our Stretford coverage includes postcode districts M32, and we also work in nearby places such as Urmston, Sale and Eccles.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about new build homes in Stretford
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
How long does a new build home take in Stretford?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
How much does a new build home cost in Stretford?
In Stretford, a new build home typically costs £1,900–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £285,000–£450,000. Your fixed price depends on the survey and drawings.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
