ShropshireNew build homes

New build homes in Telford

A new build home in Telford starts with the site: access, services, ground conditions and planning. We work through each before giving a fixed price.

Guide price in Telford

£1,950–£3,100 per m² of floor area (build cost)

In Telford, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Telford?

In Telford, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Prices in the West Midlands sit near the national average for this kind of work, and the range for Telford reflects that. Design, structural calculations and council fees are extra.

Guide prices for Telford, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£205,000–£325,500
Typical project (150 m²)£292,500–£465,000
Larger project (210 m²)£409,500–£651,000
Rate per m²£1,950–£3,100

The biggest cost drivers are:

  • Services connections
  • Site access and demolition
  • Ground conditions and foundations
  • External works and landscaping

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a new build home in Telford?

Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

Handled as part of most new build homes:

  • Superstructure, roof and windows
  • Groundworks, foundations and drainage
  • Site appraisal and feasibility
  • Building control completion and warranty liaison
  • Internal fit-out and finishes
  • Mechanical and electrical installation

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.

Building in Telford

The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.

We work across Telford and neighbouring areas such as Wellington, Shrewsbury and Wolverhampton. Postcodes we cover in Telford include TF3 and WV99.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about new build homes in Telford

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

How much does a new build home cost in Telford?

In Telford, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.

Who approves a new build home in Telford?

Planning matters in Telford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

Get a free, no-obligation home visit for your new build home in Telford.