SK Developments Free home visit0800 088 6248 Get a quote

ShropshireOrangeries

Orangeries in Telford

If you live in Telford and need more space, an orangery may be the answer. We survey the house, prepare the design and build it, with a fixed price for the agreed specification.

Guide price in Telford

£2,350–£3,300 per m² of floor area

In Telford, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in Telford?

In Telford, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Building costs in the West Midlands are close to the UK average, so the figures for Telford are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Telford, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£26,000–£36,500
Typical project (16 m²)£37,500–£53,000
Larger project (22 m²)£51,500–£72,500
Rate per m²£2,350–£3,300

Your quote will depend mainly on:

  • Size and shape of the footprint
  • Amount and type of glazing
  • Heating and flooring
  • Lantern size

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for an orangery in Telford?

Before anything is built in Telford, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

From survey to sign-off, the job normally involves:

  • Electrics, heating and plastering
  • Foundations and dwarf walls or piers
  • Design to suit the style of the house
  • French, sliding or bifold doors
  • Roof lantern and glazed panels
  • Building control sign-off where required

How long does it take?

The build itself usually takes 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in Telford

Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.

We work across Telford and neighbouring areas such as Wellington, Shrewsbury and Wolverhampton. Postcodes we cover in Telford include TF3 and WV99.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about orangeries in Telford

How much does an orangery cost in Telford?

In Telford, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.

Do you build orangeries in Telford?

Yes. We build orangeries across Telford, including postcodes TF3 and WV99. Every project starts with a free home visit.

Can an orangery replace a conservatory?

Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.

Does an orangery need planning permission?

The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.

Get a free, no-obligation home visit for your orangery in Telford.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price