What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Alloa?
In Alloa, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Building costs in Scotland are close to the UK average, so the figures for Alloa are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £26,000–£36,500 |
| Typical project (16 m²) | £37,500–£53,000 |
| Larger project (22 m²) | £51,500–£72,500 |
| Rate per m² | £2,350–£3,300 |
What moves the price most:
- Lantern size
- Size and shape of the footprint
- Opening into the house
- Heating and flooring
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Alloa?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on an orangery:
- Electrics, heating and plastering
- French, sliding or bifold doors
- Insulated perimeter roof with internal pelmet
- Foundations and dwarf walls or piers
- Building control sign-off where required
- Flooring and decoration options
How long does it take?
Expect 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Alloa
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Alloa sits in Stirling and Falkirk, about 6 miles east of Stirling. We cover the whole of Alloa, including postcodes FK10.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Alloa
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Do I need planning permission for an orangery in Alloa?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
How long does an orangery take in Alloa?
Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
How much does an orangery cost in Alloa?
In Alloa, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.