Our single-storey extension service covers Alloa and the surrounding parts of Stirling and Falkirk. Every project starts with a free visit and ends with a completion certificate.

Guide price in Alloa

£1,900–£2,800 per m² of floor area

In Alloa, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £38,000–£56,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a single-storey extension?

Single-storey rear extension with bifold doors open onto a patio and a glass roof lantern

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.

How much does a single-storey extension cost in Alloa?

In Alloa, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £38,000–£56,000. Building costs in Scotland are close to the UK average, so the figures for Alloa are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Alloa, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (14 m²)£26,500–£39,000
Typical project (20 m²)£38,000–£56,000
Larger project (28 m²)£53,000–£78,500
Rate per m²£1,900–£2,800

The biggest cost drivers are:

  • Glazing: sliding and bifold doors cost more than French doors
  • Kitchen, flooring and finishes, which we can include or leave to you
  • How much of the existing house is opened up
  • Floor area and the length of new wall

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a single-storey extension in Alloa?

Whether you need planning permission depends on your house and its location in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

On a typical single-storey extension we handle:

  • Cavity walls, insulation and roof to current building regulations
  • Structural calculations for steels and lintels
  • Doors, windows and roof glazing installed
  • Measured survey and design drawings
  • Foundations, drainage and any build-over agreement
  • Knock-through to the existing house with steel beams

How long does it take?

Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Alloa

In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.

From FK10 outwards, we take on projects throughout Alloa and the surrounding parts of Stirling and Falkirk.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about single-storey extensions in Alloa

What is a build-over agreement?

If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.

Is VAT charged on an extension?

Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.

Do I need planning permission for a single-storey extension in Alloa?

In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

Do you build single-storey extensions in Alloa?

Yes. We build single-storey extensions across Alloa, including postcodes FK10. Every project starts with a free home visit.

How much does a single-storey extension cost in Alloa?

In Alloa, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £38,000–£56,000. Your fixed price depends on the survey and drawings.

How long does a single-storey extension take?

Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.

Start with a guide price, then book a free survey for a fixed quote in Alloa.