SK Developments Free home visit0800 088 6248 Get a quote

Dumfries and GallowayOrangeries

Orangeries in Annan

We take on orangeries in Annan, about 15 miles east of Dumfries, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Annan

£2,350–£3,300 per m² of floor area

In Annan, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in Annan?

In Annan, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Prices in Scotland sit near the national average for this kind of work, and the range for Annan reflects that. Design, structural calculations and council fees are extra.

Guide prices for Annan, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£26,000–£36,500
Typical project (16 m²)£37,500–£53,000
Larger project (22 m²)£51,500–£72,500
Rate per m²£2,350–£3,300

The main things that change the cost:

  • Frame material and colour
  • Size and shape of the footprint
  • Heating and flooring
  • Opening into the house

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for an orangery in Annan?

Approvals for an orangery in Annan follow the rules for Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

What we take care of:

  • Flooring and decoration options
  • Insulated perimeter roof with internal pelmet
  • Design to suit the style of the house
  • Electrics, heating and plastering
  • Foundations and dwarf walls or piers
  • Building control sign-off where required

How long does it take?

The build itself usually takes 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Annan

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

If your home is in Annan or close by in Dumfries, Hawick and Selkirk, a free home visit is the first step.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about orangeries in Annan

How long does an orangery take in Annan?

Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.

Do I need planning permission for an orangery in Annan?

In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.

How much does an orangery cost in Annan?

In Annan, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.

Does an orangery need building regulations approval?

If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.

Can an orangery replace a conservatory?

Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.

Can it be used all year?

Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.

Tell us about your project in Annan and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price