What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Selkirk?
In Selkirk, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Building costs in Scotland are close to the UK average, so the figures for Selkirk are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £26,000–£36,500 |
| Typical project (16 m²) | £37,500–£53,000 |
| Larger project (22 m²) | £51,500–£72,500 |
| Rate per m² | £2,350–£3,300 |
The biggest cost drivers are:
- Heating and flooring
- Size and shape of the footprint
- Amount and type of glazing
- Frame material and colour
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for an orangery in Selkirk?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Roof lantern and glazed panels
- Design to suit the style of the house
- Foundations and dwarf walls or piers
- Building control sign-off where required
- Electrics, heating and plastering
- French, sliding or bifold doors
How long does it take?
Expect 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Selkirk
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Projects in Selkirk (TD7) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Selkirk
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Do I need planning permission for an orangery in Selkirk?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
How much does an orangery cost in Selkirk?
In Selkirk, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.
Who approves an orangery in Selkirk?
Planning matters in Selkirk go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
