What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Blyth?
In Blyth, an orangery typically costs £2,150–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £34,500–£49,000. We start from a UK-wide guide and adjust it for the North East, where labour and materials are typically about 10% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £23,500–£33,500 |
| Typical project (16 m²) | £34,500–£49,000 |
| Larger project (22 m²) | £47,500–£67,000 |
| Rate per m² | £2,150–£3,050 |
What moves the price most:
- Lantern size
- Frame material and colour
- Heating and flooring
- Amount and type of glazing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for an orangery in Blyth?
Here is how the rules work for an orangery in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Foundations and dwarf walls or piers
- French, sliding or bifold doors
- Roof lantern and glazed panels
- Electrics, heating and plastering
- Building control sign-off where required
- Flooring and decoration options
How long does it take?
Build time is typically 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Blyth
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
From NE24 outwards, we take on projects throughout Blyth and the surrounding parts of Northumberland.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Blyth
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
How much does an orangery cost in Blyth?
In Blyth, an orangery typically costs £2,150–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £34,500–£49,000. Your fixed price depends on the survey and drawings.
Do you build orangeries in Blyth?
Yes. We build orangeries across Blyth, including postcodes NE24. Every project starts with a free home visit.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
