What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Derry?
In Derry, an orangery typically costs £2,050–£2,900 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £33,000–£46,500. The guide for Derry reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £22,500–£32,000 |
| Typical project (16 m²) | £33,000–£46,500 |
| Larger project (22 m²) | £45,000–£64,000 |
| Rate per m² | £2,050–£2,900 |
What moves the price most:
- Amount and type of glazing
- Lantern size
- Heating and flooring
- Frame material and colour
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for an orangery in Derry?
Here is how the rules work for an orangery in Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical orangery we handle:
- French, sliding or bifold doors
- Electrics, heating and plastering
- Insulated perimeter roof with internal pelmet
- Roof lantern and glazed panels
- Design to suit the style of the house
- Flooring and decoration options
How long does it take?
Expect 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Derry
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
Derry sits in County Londonderry. We cover the whole of Derry, including postcodes BT47.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Derry
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
Do you build orangeries in Derry?
Yes. We build orangeries across Derry, including postcodes BT47. Every project starts with a free home visit.
How much does an orangery cost in Derry?
In Derry, an orangery typically costs £2,050–£2,900 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £33,000–£46,500. Your fixed price depends on the survey and drawings.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Do I need planning permission for an orangery in Derry?
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
