What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Magherafelt?
In Magherafelt, an orangery typically costs £2,050–£2,900 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £33,000–£46,500. The guide for Magherafelt reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £22,500–£32,000 |
| Typical project (16 m²) | £33,000–£46,500 |
| Larger project (22 m²) | £45,000–£64,000 |
| Rate per m² | £2,050–£2,900 |
What moves the price most:
- Heating and flooring
- Lantern size
- Amount and type of glazing
- Size and shape of the footprint
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Magherafelt?
Before anything is built in Magherafelt, we confirm which approvals apply in Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on an orangery:
- Electrics, heating and plastering
- Building control sign-off where required
- Insulated perimeter roof with internal pelmet
- Flooring and decoration options
- Foundations and dwarf walls or piers
- Design to suit the style of the house
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Magherafelt
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
Projects in Magherafelt (BT45) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Magherafelt
How much does an orangery cost in Magherafelt?
In Magherafelt, an orangery typically costs £2,050–£2,900 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £33,000–£46,500. Your fixed price depends on the survey and drawings.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Do I need planning permission for an orangery in Magherafelt?
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
Do you build orangeries in Magherafelt?
Yes. We build orangeries across Magherafelt, including postcodes BT45. Every project starts with a free home visit.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
