What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Dungannon?
In Dungannon, an orangery typically costs £2,050–£2,900 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £33,000–£46,500. The guide for Dungannon reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £22,500–£32,000 |
| Typical project (16 m²) | £33,000–£46,500 |
| Larger project (22 m²) | £45,000–£64,000 |
| Rate per m² | £2,050–£2,900 |
The main things that change the cost:
- Size and shape of the footprint
- Opening into the house
- Lantern size
- Heating and flooring
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for an orangery in Dungannon?
Before anything is built in Dungannon, we confirm which approvals apply in Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Building control sign-off where required
- Design to suit the style of the house
- Flooring and decoration options
- Foundations and dwarf walls or piers
- Electrics, heating and plastering
- Roof lantern and glazed panels
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Dungannon
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT70 outwards, we take on projects throughout Dungannon and the surrounding parts of County Tyrone.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Dungannon
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Do I need planning permission for an orangery in Dungannon?
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
How much does an orangery cost in Dungannon?
In Dungannon, an orangery typically costs £2,050–£2,900 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £33,000–£46,500. Your fixed price depends on the survey and drawings.
Who approves an orangery in Dungannon?
Planning matters in Dungannon go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
