Orangeries in Hindley

SK Developments designs, gets approval for and builds orangeries in Hindley and across Greater Manchester, with one contract from the first drawing to the building control sign-off.

Guide price in Hindley

£2,250–£3,200 per m² of floor area

In Hindley, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £36,000–£51,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is an orangery?

Brick orangery with white French doors, glazed panels and a central roof lantern at sunset

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.

How much does an orangery cost in Hindley?

In Hindley, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £36,000–£51,000. We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.

Guide prices for Hindley, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (11 m²)£25,000–£35,000
Typical project (16 m²)£36,000–£51,000
Larger project (22 m²)£49,500–£70,500
Rate per m²£2,250–£3,200

The main things that change the cost:

  • Opening into the house
  • Amount and type of glazing
  • Lantern size
  • Size and shape of the footprint

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for an orangery in Hindley?

Approvals for an orangery in Hindley follow the rules for England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

From survey to sign-off, the job normally involves:

  • Roof lantern and glazed panels
  • French, sliding or bifold doors
  • Foundations and dwarf walls or piers
  • Flooring and decoration options
  • Building control sign-off where required
  • Electrics, heating and plastering

How long does it take?

Expect 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in Hindley

The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.

We work across Hindley and neighbouring areas such as Wigan, Westhoughton and Leigh. Postcodes we cover in Hindley include WN2.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about orangeries in Hindley

How long does an orangery take in Hindley?

Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.

Does an orangery need planning permission?

The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.

Does an orangery need building regulations approval?

If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.

How much does an orangery cost in Hindley?

In Hindley, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £36,000–£51,000. Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in Hindley.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price